1. Attempt any FIVE of the
following : 10
(a) Define :
(i)
Forecasting of population
(ii)
Intake structure *
(b) State any four factors affecting rate of
demand of water. *
(c) Enlist any four types of valves provided
in water supply scheme.
(d) State any two advantages and disadvantages
of dead end system.
(e) Define trap. Sketch P-trap and S-trap.
(f) Define : (i) sewage, (ii) garbage *
(g) State any four objects of sewage
treatment.
2. Attempt any THREE of the
following : 12
(a) Draw flow diagram of water treatment
plant.*
(b) State the precautions to be taken for
collection of sample of water. *
(c) The following is the population data for a
town. Water supply scheme is to be designed for this town with a design period
of 30 years. Find the population at the end of the year 2040 by incremental
increase method. *
(d) Define Aeration. State objectives of
aeration. *
3. Attempt any THREE of the
following : 12
(a) Describe the principle behind
sedimentation with coagulation.
(b) Describe the theory of filteration.
(c) Differentiate between gravity distribution
system and pumping distribution system.*
(d) Describe the backwashing of rapid sand
filter with neat labelled sketch. **
4. Attempt any THREE of the
following : 12
(a) State different forms of chlorination.
Describe break point chlorination. *
(b) List any eight types of pipes used for
conveyance of water. *
(c) Describe expansion joint with sketch.
(d) Draw neat sketch of drop manhole.*
(e) Draw layout of sewage treatment plant.*
(f) Draw layout of grid iron system of
distribution of water and explain its suitability.
(g) Explain the functions of service
reservoirs provided for water distribution network.
(h) Explain the principles of building
drainage arrangement.
(i) Explain the term “Recycling and Reuse” of
domestic waste
5. Attempt any TWO of the
following : 12
(a) Describe the process of coagulation.
Explain the procedure of Jar test with neat labelled sketch.
(b) Describe in detail, the procedure of
laying of sewers.*
(c) Differentiate between one pipe plumbing
and two pipe plumbing system with neat labelled sketch.*
(d) Explain the method of Water softening and
Defluoridation technique
6. Attempt any TWO of the
following : 12
(a) State the systems of sewerage. Describe
separate system with merits and demerits. *
(b) Differentiate between
(i)
aerobic and anaerobic process *
(ii)
BOD and COD
(c) Describe working of trickling filter with
neat sketch. *
(d) Draw flow diagram of activated sludge
process and explain the function of each unit.