MSBTE Civil Engineering 3rd Semester Micro Project Topics For All Subjects | MSBTE Diploma Projects | Diploma I Scheme Projects Available FREE

MSBTE Civil Engineering 3rd Semester Micro Project Topics For All Subjects | MSBTE Projects | Diploma I Scheme Projects Available FREE

MSBTE Civil Engineering 3rd Semester Micro Project Topics


22301 Advanced Surveying

a.    Collect the relevant technical and commercial  information of  advanced survey 
instruments available  in the market with specifications.
b.   Carry out comparative study of  following survey instrument of different  make and 
brands: Total  station/ EDM/GPS/Micro  optic theodolite,
c.    Set the profiles of curves a1 the changes in alignment of  road in the premises of the institute.
d.   Determine the RLs of thc existing structures  like lintels, chajja, slab, and beam using 
Tacheometer and Total  station  in a multi-storeyed building and compare the results.
e.    Download specifications for Total station/ EDM/GPS/Micro  optic theodolite and make a chart.
f.    Coordinate  System —UTM (Universal  Transverse   Mercator  Coordinate system
g.   Mobile devices used for distance measurement
h.   360 degree lazcr
i.    Information about Drone survey


22302 Highway Engineering

a.     Collect  all  the details of all types of  existing NH,  SH across the country.
b.     Evaluate the  camber  and  gradient  of any  one  road  of each  type  of pavement in  the vicinity of area of college.
c.     Develop the photographic  model  of typical  pavement  structure for‘ actual   visited site. 
d.     Advance   techniques of repairs  like  CBTR  ,  White  topping.  Preventive  Maintenance.  overlays,  MBA  (  Million  Standard  Axle  load),  utility  system.  encroachment  ,  forest land under roads
e.    Any  other micro-projects suggested  by subject  faculty on similar  line.



22303 Mechanics of Structures

a,    Collect  the  IS  related  to methods  of testing  and  specifications for five materials  used in actual practice.
b.   Select  ten  materials  from day to day life and compare their mechanical  properties  and present  it in a format of report.
c.   Prepare prototype model  of various types of support,  beams and loading.
d.   Prepare  a  report  about  beam  sections  .subjected  to  bending  and  shear  stresses  from 
actual  field/design  office .along  with photographs and its justification.
Collect  photographs  aloud With  justification  about  failure  of  short  and  long  columns
front actual  field situations.


22304 Building Construction

a.     Prepare  a  sketchbook  consisting  of  components  of building  (for  Sketches  which  are not included  in Practical sketch  book),
b.    Collect  the  relevant  information  of recent  technologies  in  building  construction  and prepare a report on  it.
c.    Identify  the  different  types  of  cracks  and  remedial  measures  and submit a report on case study.
d.     Collect   the  relevant   information  of  different  techniques  of demolition   of existing structure  and  submit a report on it.
e.     Prepare  a  summary   report  with reference to content in any one part of National  Building Code.


22305 Concrete  Technology.

a.     Undertake any one  micro-projects (Group of 4 to 6 students)
i.   Prepare  cast  in  situ  concrete  of given  grade.  It  includes  visit  to  site, observations, records, field  tests  of cement,  sand  and  coarse  aggregate.  Follow  the concrete  chain operations.
ii.   Using   lS  code  method   of  mix  design   obtain   ingredients  of  concrete  and   prepare concrete.
Note: Any other relevant  micro project suggested  by subject  teacher.



22022  Computer Aided Drawing

a.    Draw  plan,  elevation,  null  section  of  a  given  framed  structure  as  it is  from  the  available drawings using soft   are available in laboratory.
b.   Prepare  construction  notes,  site  plan,  and  schedule  of opining  s  from  the  drawings  of  a framed structure made available from  builder/engineer‘/civil engineering service provider.
c.    Dr aw  plan, elevation,  and  section  and  site  plan  of a given  load  bearing  structure as  it  is
from the available drawings using software available in laboratory.
d.    prepare  construction  notes,  site  plan,  and  schedule  of openings  from  the  drawings  of a load  bearing  structure   made  available  from  builder/engineer/civil  engineering   service provider.
e.    Learn  latest software’s  of Civil  Engg Drawing


MSBTE Diploma All Branch Projects:

  1. Computer Engineering
  2. Information Technology
  3. Civil Engineering
  4. Electrical Engineering
  5. Mechanical Engineering
  6. Electronic Engineering

Click on Any Branch or Any Semester to go on it. If you want your suggested projects then please let us know in our comment section. comment down your ....... 
1.Name: *******
2.Branch: *******
3.Semester: ******
4.Project Topic: *****

Share with your all friends & help them to score more.
THANK YOU😇

3 Comments

  1. Awesome post, I read an interesting topic here, and I like your style. and please continue with effective work Construction Company in Australia Thank you for sharing this blog here.

    ReplyDelete
  2. House cleaning can often feel like a chore, but with the help of an app, it can be a lot more streamlined and efficient. There are a number of great house cleaning apps available on the market, and each offers its own unique benefits. app for house cleaning

    ReplyDelete
  3. Elevate your projects with our professional drone survey in Rourkela. Our advanced drones capture high-resolution aerial data, enabling accurate mapping, construction site monitoring, agricultural analysis, and more. With experienced drone operators, we provide cost-effective solutions for various industries. Count on us for in-depth topographical surveys, 3D mapping, and thermal imaging. Enhance efficiency, reduce costs, and make informed decisions with our Rourkela drone survey expertise. Contact us today for tailored solutions to meet your unique needs and gain a competitive edge in your industry.

    ReplyDelete
Previous Post Next Post